NO. |
Client |
Customer |
Project Description |
Capacity (MW)
|
Q'ty(Ton)
|
Delivery |
1 |
Hebei Provincial Electric Power Bureau |
Harbin Boiler Factory |
Xingtai Power Plant, Hebei Province-#7 Boiler steel structure |
200 |
1,500 |
Feb. 1988 |
2 |
Electric Power Bureau of Inner Mongolia Region |
Harbin Boiler Factory |
Fulaerji Power Plant, Inner Mongolia Region -#6 Boiler steel structure |
200 |
2,000 |
June 1988 |
3 |
Jiangsu Provincial Electric Power Bureau |
Foster Wheeler Energy Corporation, USA |
Ligang Power Plant - #1 and #2 Boiler steel structure and Coal Bunker |
350 |
6,800 |
1989-Feb. 1990 |
4 |
Zhejiang Provincial Electric Power Bureau |
C&E Corporation, USA |
Beilungang Power Plant, Zhejiang Province -Steel Structure of Fuel Oil Pump House, Supply Oil Pump House and Aux. Boiler House |
600 |
350 |
1989-Feb. 1990 |
5 |
Hebei Provincial Electric Power Bureau |
B&W Beijing Co. Ltd. |
Xibaipo Power Plant, Hebei Province - Boiler steel structure |
300 |
3,500 |
1992 |
6 |
Shandong Provincial Electric Power Bureau |
Foster Wheeler Energy Corporation, USA |
Zouxian Power Plant, Shandong Province - #2 Boiler steel structure |
600 |
1,630 |
1995 |
7 |
Hubei Provincial Electric Power Bureau |
Foster Wheeler Energy Corporation, USA |
Ezhou Power Plant, Hubei Province - Boiler steel structure |
350 |
8,200 |
Nov. 1995 |
8 |
Hebei Provincial Electric Power Bureau |
Black & Veatch International, USA |
Hanfeng Power Plant, Hebei Province - Boiler steel structure |
660 |
8,700 |
1999 |
9 |
Fujian Provincial Electric Power Bureau |
FMC Corporation, USA |
Meizhouwan Power Plant - steel structures for coal handling system |
360 |
1,200 |
Mar.-June 1999 |
10 |
Guanxi Airport , Japan |
NC Corporation, Japan |
Guanxi Airport - Conveyer tail frame |
|
49 |
Oct. 1999 |
11 |
Hebei Provincial Electric Power Bureau |
Foster Wheeler Energy Corporation, USA |
Hanfeng Power Plant, Hebei Province - Gas duct damper and windbox truss |
660 |
840 |
1998-99 |
12
|
Tuoketuo Power Plant ? Dingzhou Power Plant |
Neimenggu Tuoketuo ? Dezhou ? Dingzhou |
Boiler ? Turbine Beam ? VB ? HB ? Column |
2x660 |
2500 |
2001~2004 |
13
|
Dongfang Boiler Factory |
Hengdeli CFB Thermo-eletric Plant |
Boiler Column ? Beam and Brass |
2x125 |
280 |
2001.6~8 |
14
|
Baoshan Metallurgy Construct General Group. |
Enlarging Project Shanxi Haixin Steel Processing Factory |
Rolling Mill Steel Structure |
250T (Flat Furnace) |
260 |
2002.3~2003.9 |
15
|
No.1 Metallurgy Construct General Group. |
Enlarging Project Shanxi Haixin Steel Processing Factory |
Wind-Heated Furnace |
250T (Flat Furnace) |
460 |
2001.10~2002.2 |
16
|
Shanxi Construct Group. |
280 Thousand Tons Alumina Thermo-eletric Plant Workshop 4# Shanxi Aluminium Factory |
Workshop steel structure |
280 Thousand Tons Aluminium Factory |
1890 |
2003.11~2004.2 |
17
|
No.1 Metallurgy Construct General Group. |
Jiangsu Tieben Steel Company |
Wind-Heated Furnace |
|
1500 |
2003.11~2004.2 |
18 |
Shanxi Construct Group. |
Eight Hundred Thousand Tons Alumina Thermo-eletric Plant Shanxi Aluminium Factory |
Steel structure of main workshop, coal bunker and control building |
Eight Hundred Thousand Tons Aluminium Factory |
3000 |
2004.2 ~ 10 |
19 |
Foster Wheeler International Trading( Shanghai ) Company Limited |
Sinopec Maoming Petrochemical Company |
Guangdong Maoming 2x410t/h CFB Power Plant |
2x410t/hCFB Boiler |
1000 |
2004.3 ~ 12 |